Menu


Home



Design



Build



Maintain



About



Contact



Projects

© 2024 Copyright Baruzzini Aquatics



Home



Design



Build



Maintain



About



Contact



Projects

UNIVERSITY OF MICHIGAN FOOTBALL PERFORMANCE CENTER

Completed in 2019, this $14.8 million renovation to Schembechler Hall included areas for athletic medicine, wellness, nutrition, rehabilitation, and training for the University of Michigan football program.  Along with new meeting rooms, locker areas, and administrative spaces this renovation included two resistance therapy pools, warm and cold spas, and a cryogenic workout recovery pool.

↓ NEXT PROJECT
UNIVERSITY OF MICHIGAN FOOTBALL PERFORMANCE CENTER

Completed in 2019, this $14.8 million renovation to Schembechler Hall included areas for athletic medicine, wellness, nutrition, rehabilitation, and training for the University of Michigan football program.  Along with new meeting rooms, locker areas, and administrative spaces this renovation included two resistance therapy pools, warm and cold spas, and a cryogenic workout recovery pool.

↓ NEXT PROJECT
KALAMAZOO COLLEGE

An 11 lane lap pool with custom concrete 3 Meter & 1 Meter dive stands is one of a kind in Michigan.  The pool utilizes a deck level stainless steel gutter profile for improved egress and better acoustics for instruction.  This gutter also hides a secret... a special air channel called the Evacuator ™ which is a chloramine mitigation system.  This system captures chloramines at the source and the result provides drastically improved air quality within the natatorium for athletes and spectators.

MORE ABOUT THE EVACUATOR
↑ PREV. PROJECT
↓ NEXT PROJECT
KALAMAZOO COLLEGE

Completed in 2019, this 11 lane lap pool with custom concrete 3 Meter & 1 Meter dive stands is one of a kind in Michigan.  The pool utilizes a deck level stainless steel gutter profile for improved egress and better acoustics for instruction.  This gutter also hides a secret... a special air channel called the Evacuator ™ which is a chloramine mitigation system.  This system captures chloramines at the source and the result provides drastically improved air quality within the natatorium for athletes and spectators.

MORE ABOUT THE EVACUATOR
↑ PREV. PROJECT
↓ NEXT PROJECT
HOLLAND COMMUNITY AQUATIC CENTER

Still under construction, this addition to an existing aquatic center in Holland, Michigan includes five new bodies of water including a Leisure Pool, a Multi-Purpose Pool, a Recreational Lap Pool, a tremendously large Spa, and a Dive Pool.  Originally brought on to only assist during the schematic design phase, Baruzzini Aquatics ended up taking over full design and build services. Check back soon as more photos are being added as the project nears completion.

↑ PREV. PROJECT
↓ NEXT PROJECT
HOLLAND COMMUNITY AQUATIC CENTER

Still under construction, this addition to an existing aquatic center in Holland, Michigan includes five new bodies of water including a Leisure Pool, a Multi-Purpose Pool, a Recreational Lap Pool, a tremendously large Spa, and a Dive Pool.  Originally brought on to only assist during the schematic design phase, Baruzzini Aquatics ended up taking over full design and build services. Check back soon as more photos are being added as the project nears completion.

↑ PREV. PROJECT
↓ NEXT PROJECT
WOODHAVEN HIGH SCHOOL

Completed in 2018, this eight lane 25 yard x 6 lane 25 meter competition pool incorporates a large leisure area with bench seating segregated from the swim lanes.  It's features also include a 20’x10’ full matrix LED display, 1 meter dive platform with cantilevered jump stand, custom long reach starting blocks, powder coated rail goods, large mosaic murals on the pool bottom and a fully recessed gutter at both ends of the competition course.  The pool utilizes pressure sand filtration with a filter rate below 12gpm/sf and has CO2/Acid switchable pH control for alkalinity management along with variable ultraviolet treatment that adjusts intensity based on combined chlorine reading at the sample stream.

↑ PREV. PROJECT
↓ NEXT PROJECT
WOODHAVEN HIGH SCHOOL

Completed in 2018, this eight lane 25 yard x 6 lane 25 meter competition pool incorporates a large leisure area with bench seating segregated from the swim lanes.  It's features also include a 20’x10’ full matrix LED display, 1 meter dive platform with cantilevered jump stand, custom long reach starting blocks, powder coated rail goods, large mosaic murals on the pool bottom and a fully recessed gutter at both ends of the competition course.  The pool utilizes pressure sand filtration with a filter rate below 12gpm/sf and has CO2/Acid switchable pH control for alkalinity management along with variable ultraviolet treatment that adjusts intensity based on combined chlorine reading at the sample stream.

↑ PREV. PROJECT
↓ NEXT PROJECT
UMRC WELLNESS CENTER

Utilized primarily for health and wellness, this project was completed in winter of 2018 for United Methodist Retirement Community in Chelsea Mi.  This pool is equipped with a current area for resistance walking and a large ADA ramp for improved accessibility. The pool extends to a depth of seven feet’ and has ample room for recreational lap swimming and bench seating.The large family style spa includes inverted scupper water features and an ADA transfer system.

↑ PREV. PROJECT
↓ NEXT PROJECT
UMRC WELLNESS CENTER

Utilized primarily for health and wellness, this project was completed in winter of 2018 for United Methodist Retirement Community in Chelsea Mi.  This pool is equipped with a current area for resistance walking and a large ADA ramp for improved accessibility. The pool extends to a depth of seven feet’ and has ample room for recreational lap swimming and bench seating.The large family style spa includes inverted scupper water features and an ADA transfer system.

↑ PREV. PROJECT
↓ NEXT PROJECT
UNIVERSITY CLUB AT MICHIGAN STATE UNIVERSITY

Completed in 2017 this beautiful facility features a spacious zero entry area  with water features and seating, a diving well with .5M spring board, six 25 yard short course swim lanes and adult only spa area with fire pit.  Originally tasked with renovating the existing 70's era pool, we identified through value engineering a way to fully replace the pool without breaking the budget.We expect this new pool to serve club members well for many more decades to come thus allowing the next generation to continue building lasting family memories at the University Club.

↑ PREV. PROJECT
↓ NEXT PROJECT
UNIVERSITY CLUB AT MICHIGAN STATE UNIVERSITY

Completed in 2017 this beautiful facility features a spacious zero entry area  with water features and seating, a diving well with .5M spring board, six 25 yard short course swim lanes and adult only spa area with fire pit.  Originally tasked with renovating the existing 70's era pool, we identified through value engineering a way to fully replace the pool without breaking the budget.We expect this new pool to serve club members well for many more decades to come thus allowing the next generation to continue building lasting family memories at the University Club.

↑ PREV. PROJECT
↓ NEXT PROJECT
BRIGHTON HIGH SCHOOL

This 12 lane 25 yard pool was constructed in 2015 on geopiles due to poor ground conditions.  Utilizing the most precision tile workmanship you will find in the industry, this competition pool is FAST. Course length tolerances are within 1/32 of an inch between lanes.  This pool is equipped with nothing but the best in terms of competition equipment, scoring system and scoreboard, along with superior filtration and water treatment.  With its proximity to our home office, we are proud to show this one off to future clients looking to plan for their own new competition pool.

↑ PREV. PROJECT
↓ NEXT PROJECT
BRIGHTON HIGH SCHOOL

This 12 lane 25 yard pool was constructed in 2015 on geopiles due to poor ground conditions.  Utilizing the most precision tile workmanship you will find in the industry, this competition pool is FAST. Course length tolerances are within 1/32 of an inch between lanes.  This pool is equipped with nothing but the best in terms of competition equipment, scoring system and scoreboard, along with superior filtration and water treatment.  With its proximity to our home office, we are proud to show this one off to future clients looking to plan for their own new competition pool.

↑ PREV. PROJECT
↓ NEXT PROJECT
CLEMENT CIRCLE PARK

What was once an old, dilapidated 25 Meter pool was transformed into a fantastic new recreational asset for the City of Farmington with dual community pools.  Completed in 2016, these two pools are both 42’x75’ and each packs in a lot of amenities.  The zero pool extends to a depth of 36 inches and is full of interactive toys and water features including a pirate ship.  The lap pool is equipped with climbing walls and a large poolside slide in addition to six swim lanes.  A new seasonal equipment room was also constructed utilizing both new and existing infrastructure to support the new pool systems.

↑ PREV. PROJECT
↓ NEXT PROJECT
CLEMENT CIRCLE PARK

What was once an old, dilapidated 25 Meter pool was transformed into a fantastic new recreational asset for the City of Farmington with dual community pools.  Completed in 2016, these two pools are both 42’x75’ and each packs in a lot of amenities.  The zero pool extends to a depth of 36 inches and is full of interactive toys and water features including a pirate ship.  The lap pool is equipped with climbing walls and a large poolside slide in addition to six swim lanes.  A new seasonal equipment room was also constructed utilizing both new and existing infrastructure to support the new pool systems.

↑ PREV. PROJECT
↓ NEXT PROJECT
ROMULUS RECREATION CENTER

Completed in 2007 this facility has just about anything you can fit within a 10,000 square foot footprint. The indoor portion of the aquatic center features a four lane, 25 yard lap pool for rec swimming and a large lazy river with interior jetted bench areas provides a place for people to relax or gather comfortably and socialize.  The 28 foot tall flume slide exits into its own splash down pool to segregate the slide riders from the rest of the bathers. A zero entry play area with dumping bucket provides lots of fun for all age groups and the spa is large enough to accommodate up to 40 people.  This facility also has an outdoor pool that is zero entry extending to a depth of 24 inches. This pool is equipped with more water features including a dumping bucket with a capacity of 150 gallons per dump.

↑ PREV. PROJECT
↓ NEXT PROJECT
ROMULUS RECREATION CENTER

Completed in 2007 this facility this aquatic center features a four lane, 25 yard lap pool for rec swimming and a large lazy river with interior jetted bench areas provides a place for people to relax or gather comfortably and socialize.  The 28 foot tall flume slide exits into its own splash down pool to segregate the slide riders from the rest of the bathers. A zero entry play area with dumping bucket provides lots of fun for all age groups and the spa is large enough to accommodate up to 40 people.  This facility also has an outdoor pool that is zero entry extending to a depth of 24 inches. This pool is equipped with more water features including a 150 gallon dumping bucket.

↑ PREV. PROJECT
↓ NEXT PROJECT
TRENTON HIGH SCHOOL

Eight lane 25 yard x eight lane 25 meter short course with 1 Meter diving platform completed in 2020 this pool has incorporated a fully recessed gutter for improved sight lines for athletes resulting in faster times. The natatorium is equipped with a large 10’x20’ full matrix video display board, custom long reach starting blocks with branding and track start accessories.Pressure sand filtration system is designed for filtration rates at or near 11gpm/sf resulting in longer runs times before backwashing.

↑ PREV. PROJECT
↓ NEXT PROJECT
TRENTON HIGH SCHOOL

Eight lane 25 yard x eight lane 25 meter short course with 1 Meter diving platform completed in 2020 this pool has incorporated a fully recessed gutter for improved sight lines for athletes resulting in faster times. The natatorium is equipped with a large 10’x20’ full matrix video display board, custom long reach starting blocks with branding and track start accessories.Pressure sand filtration system is designed for filtration rates at or near 11gpm/sf resulting in longer runs times before backwashing.

↑ PREV. PROJECT
↓ NEXT PROJECT
FARMINGTON HILLS COMMUNITY CENTER

This 245,000-square-foot community center was renovated from an abandoned high school in Farmington Hills. It includes a large natatorium/aquatic center that features a zero-depth entry pool, a large waterslide, a lazy river, a zip line, a climbing wall, and plenty of room for lap swimming and family activities.  Completed in 2020, FHCC is a great destination for all age groups and swimming abilities.

↑ PREV. PROJECT
↓ NEXT PROJECT
FARMINGTON HILLS COMMUNITY CENTER

This 245,000-square-foot community center was renovated from an abandoned high school in Farmington Hills. It includes a large natatorium/aquatic center that features a zero-depth entry pool, a large waterslide, a lazy river, a zip line, a climbing wall, and plenty of room for lap swimming and family activities.  Completed in 2020, FHCC is a great destination for all age groups and swimming abilities.

↑ PREV. PROJECT
↓ NEXT PROJECT
PORTAGE N. & PORTAGE C. HIGH SCHOOLS

Portage Central HS and Portage Northern HS pools are matching ten lane 25 yard x eight lane 25 meter pools with double 1 Meter springboards.Both projects were part of a district wide bond that stretched between 2017 to 2021.  These pool are configured in a very efficient way allowing for eight lane swim and diving to run simultaneously along with providing regulation water polo courses.  Because the district wanted to keep both pools identical, we were able to provide matching equipment throughout both facilities which helps to streamline operations along with normal maintenance items.

↑ PREV. PROJECT
↓ NEXT PROJECT
PORTAGE N. & PORTAGE C. HIGH SCHOOLS

Portage Central HS and Portage Northern HS pools are matching ten lane 25 yard x eight lane 25 meter pools with double 1 Meter springboards.Both projects were part of a district wide bond that stretched between 2017 to 2021.  These pool are configured in a very efficient way allowing for eight lane swim and diving to run simultaneously along with providing regulation water polo courses.  Because the district wanted to keep both pools identical, we were able to provide matching equipment throughout both facilities which helps to streamline operations along with normal maintenance items.

↑ PREV. PROJECT
↓ NEXT PROJECT
FIREKEEPERS CASINO & HOTEL

Completed for grand opening on 12/12/12, this luxury multilevel pool is also equipped with state of the art display fountain elements.  These fountains utilize laminar flow, water switches and LED/RGB lights to provide four sequenced water and light shows for display when the pool is not in use by bathers.  This project also includes a large family spa and triangular entrance fountain with static display nozzles.

↑ PREV. PROJECT
FIREKEEPERS CASINO & HOTEL

Completed for grand opening on 12/12/12, this luxury multilevel pool is also equipped with state of the art display fountain elements.  These fountains utilize laminar flow, water switches and LED/RGB lights to provide four sequenced water and light shows for display when the pool is not in use by bathers.  This project also includes a large family spa and triangular entrance fountain with static display nozzles.

↑ PREV. PROJECT
BACK TO TOP
© 2022 Baruzzini Aquatics, LLC